From: Investigating measures for applying statistical process control in software organizations
Measures | Publications | Processes | Goals |
---|---|---|---|
aRework efficiency (number of fixed defects / defect fixing effort) | P16,P18,P40 | Fixing | G08.2;G05.1;G05.9 |
aInspection performance (size of inspected product/ effort spent on the inspection) | P11,P28 | Review | – |
bInspection productivity (number of detected defects in the inspection/ effort spent on the inspection) | P48 | Review | – |
aProductivity (effort/product size) | P03,P07,P16,P19,P20,P30,P31,P27 | Maintenance, Requirements Analysis, Design, Coding, Testing | G01;G03;G09.1;G05.2;G08;G10 |
bDefect closure date variance (actual defect closure date – planned defect closure date) | P13 | Review | G05.6 |
aReview performance (effort spent on the review /size of the reviewed product) | P07 | Review | G10 |
aDefect resolution efficiency (number of solved defects /resolution effort) | P07,P17,P25 | Review | G06;G10.2 |
aEffective preparation speed (product size/average time spent preparing for review + average time spent preparing for rereview) | P34 | Review | G02 |
aEffective review speed (product size/ time spent on all reviews of the product) | P34 | Review | G02 |
aPreparation speed (product size/average time spent preparing for review) | P34 | Review | G02 |
aReview speed (product size/spent time on review) | P03,P24,P34 | Review | G02;G04.3 |
aTest defect detection efficiency (number of defects in tests / effort spent reviewing tests) | P07,P17 | Review | G13 |
aDefect detection efficiency (number of defects detected in the review/detection effort) | P07,P17,P25,P19 | Review, Testing | G06;G10.2;G03 |
aSystem test speed (size of the tested product/time spent on system test) | P07 | Testing | G10.5 |
aTest defect resolution efficiency (number of resolved defects / effort spent resolving the defects) | P07,P17 | Testing | G13 |
aTest design productivity (number of test cases designed / test cases design effort) | P07,P09,P17 | Testing | G12 |
aTest execution productivity (number of test cases executed/ effort spent on executing test cases) | P09 | Testing | G12 |
aTest procedure preparation productivity (number of test cases/effort spent on test procedure preparation) | P09 | Testing | – |
aTest script productivity (number of test cases/effort spent developing test script) | P07,P17 | Testing | G13 |
aUnit test speed (size of the tested product/time spent on unit test) | P07 | Testing | G10 |